Curing Compound for Contractors: Specs, VOC Limits and Bulk

On a spec job, three things pick the curing compound: the ASTM type and class in the spec, the VOC limit where you pour, and what the next trade puts on the slab. Get all three right before you order, and use a dissipating cure where flooring or coatings follow.

Guides in this section

Read the spec first

  • ASTM C309: the curing compound standard. Type 1 is clear or fugitive dye, Type 2 is white pigmented; Class A has no limit on the solids, Class B must be resin.
  • ASTM C1315: cure and seal films, with a tighter water loss limit (0.40 kg/m²) and classes that rate yellowing.
  • DOT work: many state DOTs accept only products on their approved list, and some add stricter limits than C309.
  • Submittals: our specifier checklist lists what to ask for, from the data sheet to the flooring compatibility letter.

Check the VOC limit before you order

The federal limit for curing compounds is 350 g/L, with 700 g/L allowed for C1315 cure and seals. California, Canada and several eastern states hold everything to 350 g/L with no 700 category, and Southern California's South Coast district caps most uses at 100 g/L. Look up your area in our VOC limits table.

Protect the flooring handoff

Most bond failures start with a cure and seal left on a slab that later gets adhesive or a coating. Where flooring follows, spec a dissipating resin cure, get the flooring maker's sign-off, and run the water drop and bond tests before the installer arrives. See testing for curing compound.

Products by job

Curing compound type by job, with data sheet examples
JobWhat to useExamples on our review pages
Interior slab getting flooring or a densifierDissipating resin, C309 Type 1Euclid Kurez DR VOX, W.R. Meadows 1100, Dayton J11W
Bare slab, inside or out25% solids cure and seal, C1315 Class ADayton J22WB, Concrete Sealers USA TS202
Exterior paving in sunWhite pigmented, C309 Type 2W.R. Meadows 1600-WHITE
Stamped or colored exteriorSolvent acrylic cure and sealNox-Crete Cure & Seal 1315, Concrete Sealers USA TS200 where 700 g/L is allowed

For the full side by side, see best curing compounds.

Weather and bulk buying