Which Curing Compound Do I Need?

If anything will be glued, coated or polished on the slab later, use a dissipating compound or a curing method that leaves nothing behind. For colored or decorative work, use a clear cure and seal. Otherwise choose by location and the spec.

Answer three questions

Will flooring, tile, epoxy or polish go on this slab later?
Is the concrete colored, stamped or decorative?
Is the slab indoors or outdoors?

Answer the questions to see a recommendation.

How the chooser decides

The first question matters most. Curing compound left on a slab can stop flooring adhesives, coatings and polish from bonding, so any slab that will get a finish later is steered to a product made to dissipate or to be removed.

  • Flooring later: dissipating resin, or a non-membrane cure such as wet curing.
  • Decorative or colored: a clear cure and seal that also protects the surface.
  • Plain slab: pick by location, exposure and what the spec or inspector requires.