Nox-Crete Cure and Seal 1315 Review
Nox-Crete Cure & Seal 1315 A is a 25% solids, solvent-based acrylic that meets ASTM C1315 Type 1 Class A and B. Spray it at about 250 ft²/gal (6.1 m²/L) to cure. Buy A-350 where VOC rules are tight and A-700 for cold-weather spraying. It is for exterior use only.
The verdict
Buy it if
- You want a solvent C1315 Type 1 cure and seal for exterior work
- You want a choice of A-350 for tight VOC rules or A-700 for cold-weather spraying
Skip it if
- The job is indoors or enclosed; Nox-Crete says exterior use only
- The slab gets flooring or a coating later
Consider instead
- Concrete Sealers USA TS200, a 25% solids solvent acrylic with a wet look, where 700 g/L is allowed (stamped picks)
- Dayton J22WB for a water-based C1315 cure and seal you can use inside
This review is built from Nox-Crete’s product data sheet and product page. There are no star ratings and no field results here, because no field test has been run yet. No affiliate links are on this page.
What is Nox-Crete Cure & Seal 1315 A?
It is a solvent-based acrylic cure and seal sold mostly through concrete supply houses. Nox-Crete calls it an “economical high-solids solvent-based non-yellowing copolymer acrylic” (Nox-Crete data sheet). The product page gives it 25% solids.
It meets the cure and seal spec, ASTM C1315, Type 1 Class A and B, and the plain curing spec, C309. If you are new to the category, read what a cure and seal does before you pick one.
What does the 1315 A data sheet say?
It says 25% solids, about 250 ft²/gal (6.1 m²/L) for curing, two VOC versions, and exterior use only. The sheet was updated 04/29/25. “Not stated” means the sheet does not give the figure.
| Spec | Nox-Crete Cure & Seal 1315 A |
|---|---|
| Standards | C1315 Type 1 Class A & B; C309 Type 1 Class A & B; AASHTO M 148 Type 1 Class B |
| Base | Solvent-based copolymer acrylic, non-yellowing |
| Solids | 25% (product page) |
| VOC | Under 350 g/L (A-350) or under 700 g/L (A-700) |
| Rate, curing | About 250 ft²/gal (6.1 m²/L) per application |
| Rate, sealing | About 300 ft²/gal (7.4 m²/L) |
| Dissipates? | Not stated; sold as a recoatable sealing film |
| Dust and tack free | 2 hours (table) |
| Light / normal traffic | 12 hours / 24 hours |
| Lowest application temp | 40°F (4°C), and not if it will drop below 40°F within 12 hours |
| Sizes | 1 gal (3.8 L), 5 gal (19 L), 20 L, 55 gal (208 L), 200 L |
| Shelf life | 2 years, stored at 40 to 100°F (4 to 38°C) |
| Sheet date | Updated 04/29/25 |
One conflict on the sheet: the Advantages list says dust free in 30 minutes, while the dry time table says 2 hours. Plan around the 2 hours.
Should you buy A-350 or A-700?
Buy A-350 if your area has tight VOC rules, and A-700 if you need to spray in the cold and A-700 is legal where you work. Nox-Crete says A-700 “meets all federal VOC requirements,” and A-350 “is VOC-compliant in Canada and all U.S. states but California.”
| A-350 | A-700 | |
|---|---|---|
| VOC | Under 350 g/L | Under 700 g/L |
| Sheet’s compliance chart | USEPA, OTC I, OTC II, AZ-MCAQMD, Canada | USEPA only |
| Not checked for | CARB 2000, CARB 2007, CARB 20/SCAQMD | OTC I and II, AZ-MCAQMD, Canada, CARB |
| Bulk density | 8.46 lb/gal | 7.16 lb/gal |
| Freeze point | Below 35.6°F (2°C) | Below -20°F (-29°C) |
| Flash point | Above 64.4°F (18°C) | Above 73.4°F (23°C) |
The sheet also warns that it “may be prohibited as a sealer” in some VOC districts while still allowed as a curing compound. If you are using it to reseal old concrete, check your local rule first.
Where does it fit and where does it not?
It fits exterior flatwork that you want cured and sealed in one pass with a heavier film. The product page lists residential sidewalks and driveways, stamped concrete, pool decks and parking decks. It does not fit anything indoors or enclosed, because the data sheet says its low flash point limits it to exterior use.
| Job | Fit | Why |
|---|---|---|
| Driveway, walk, patio, pool deck | Yes | Listed uses |
| Stamped or colored exterior concrete | Yes, with care | Listed use; sheet warns of mottling; CHROMA TINT add-on available |
| Cold-weather pours | A-700 | Sprayable in freezing temperatures; lower freeze point |
| Interior slab or garage | No | Exterior only, per the data sheet |
| Slab under hydrostatic pressure or poorly drained | No | Sheet says do not use |
| Surface getting more concrete or plaster | No | Sheet says do not use |
| Slab getting tile or paint later | Site test first | Sheet: compatible with “most” resilient tile adhesives and concrete paints |
The flooring row matters because interior floors are where cure and seal films cause trouble. Read curing compound and flooring before you use any film-forming product on a slab that will get a covering. An AECOM quality bulletin notes that “almost all floor leveling & flooring manufacturer[s] require the concrete be free of curing compounds” (AECOM).
How do you apply it on fresh concrete?
Spray it right after final finishing, once the surface sheen is gone, to a continuous film without puddles. These steps come from the data sheet.
- Check the temperature. Do not apply below 40°F (4°C), or if it will drop below 40°F within 12 hours.
- Wait until bleed water has evaporated and the sheen is gone. The concrete should be damp, not wet. Spraying over bleed water can blister the film, and the risk is higher over a vapor barrier.
- Use a sprayer with an 8006 nozzle and chemical-resistant hoses. Do not thin it.
- Apply at about 250 ft²/gal (6.1 m²/L) to a continuous film. Avoid over-application, puddles and runs.
- If you want a second coat, wait until the first is thoroughly dry.
- Clean tools with xylene or Aromatic 100.
On older, previously cured concrete the sheet calls for cleaning with TSP, rinsing, letting it dry 24 to 48 hours, then applying, with a second coat 24 hours later. It is slippery when wet, and Nox-Crete sells a non-slip additive for it.
What does Nox-Crete 1315 A cost?
At Vieira Concrete, the A-350 was listed at $45.00 for 1 gal and $177.00 for 5 gal, price checked 2026-11-08. The same page showed “Not Available For Sale,” so call before you count on it. At $177.00 and 250 ft²/gal, that is about 14 cents per square foot.
Nox-Crete’s own product page showed a range of $133.98 to $1,546.55 across its 4-pack of 1 gal, 5 gal pail and 55 gal drum, checked 2026-11-08. The page text did not break that out by size.
What are the alternatives?
Pick by where the slab is and what goes on it next. The best curing compounds comparison lines up eight products by data sheet.
- Water-based, lower VOC, big box shelf: Quikrete Acrylic Concrete Cure and Seal 8730, 20% solids, meets C309.
- Water-based, lowest VOC on the shelf: Sakrete Cure ‘n Seal, 10 g/L, meets C309 when used as directed.
- Water-based cure and seal from a supply house: Dayton Cure & Seal 25% J22WB.
- Solvent acrylic, same 25% solids, by mail: Concrete Sealers USA TS200, C1315 Type 1 Class A, high gloss, under 700 g/L only.
- Interior slab getting flooring, epoxy or densifier: a dissipating resin cure such as Euclid Kurez DR VOX or W.R. Meadows 1100.
Nox-Crete 1315 A vs Concrete Sealers USA TS200
| Spec | Nox-Crete 1315 A | TS200 |
|---|---|---|
| Standards | C1315 Type 1, Class A and B; C309 Type 1, Class A and B | C1315 Type 1, Class A; C309 Type 1, Class A and B |
| Base | Solvent-based copolymer acrylic | Solvent, pure acrylic |
| Solids | 25% (product page) | 25% |
| VOC | Under 350 g/L (A-350) or under 700 g/L (A-700) | Under 700 g/L |
| Rate | About 250 ft²/gal curing | 250 to 350 ft²/gal as a cure and seal |
| Finish | Non-yellowing | High gloss wet look, non-yellowing |
| Lowest temperature | 40°F (4°C) | 40°F (4°C) |
| Sizes | 1 gal, 5 gal, 20 L, 55 gal, 200 L | 5 gal, 55 gal |
Both columns are the makers’ published claims, not our tests.
If you already sprayed it inside or on a slab getting a finish
Nox-Crete’s sheet itself says to site test before applying other sealers or adhesives over it. If the test fails, plan on mechanical removal.
Frequently asked questions
What is the difference between Nox-Crete 1315 A-350 and A-700?
VOC content and cold tolerance. A-350 is under 350 g/L and A-700 under 700 g/L. The data sheet gives A-700 a freeze point below -20°F (-29°C), against below 35.6°F (2°C) for A-350. Nox-Crete says A-350 is VOC-compliant in Canada and all U.S. states but California.
How much does Nox-Crete Cure & Seal 1315 A cover?
About 250 ft² per gallon (6.1 m²/L) per application when curing fresh concrete, and about 300 ft² per gallon (7.4 m²/L) when sealing. Rates vary with surface texture and porosity.
Can you use Nox-Crete Cure & Seal 1315 A indoors?
No. The data sheet says that because of its low flash point it is for exterior use only, not interior or enclosed areas. Nox-Crete's product page lists concrete floors among its uses, but the safety limit on the data sheet is the one to follow.
Does Nox-Crete 1315 A meet ASTM C309?
Yes. The data sheet lists ASTM C309 Type 1 Class A and B and AASHTO M 148 Type 1 Class B, as well as ASTM C1315 Type 1 Class A and B.
How soon can you walk on Nox-Crete Cure & Seal 1315 A?
The data sheet gives 12 hours for light foot traffic and 24 hours for normal traffic. It lists dust and tack free at 2 hours in the dry time table.