Reviews
Dayton Superior J22WB and J11W Curing Compound Review
Dayton Superior makes two common water-based cures. Cure & Seal 25% J22WB is a 25% solids acrylic that cures and seals, meeting ASTM C309 and C1315 Type 1, Class A. Clear Resin Cure J11W is a dissipating resin cure that meets C309 Type 1 and wears off in 30 to 60 days. Both are under 100 g/L VOC.
The verdict
Buy it if
- J22WB: you want a water-based C1315 Class A cure and seal for a slab that stays bare, inside or out
- J11W: you want a dissipating C309 cure that wears off in 30 to 60 days
- Either: you need under 100 g/L
Skip it if
- J22WB on a slab getting epoxy, polyester or urethane; Dayton says remove it first
- J11W where you want a seal that lasts
Consider instead
- Concrete Sealers USA TS202 for a satin water-based C1315 cure and seal in 1 gal jugs (driveway picks)
- Euclid Kurez DR VOX as the other dissipating option
This review is built from Dayton Superior’s two data sheets, not from field trials or star ratings. No affiliate links are on this page. To see these two next to other products, use the best curing compounds roundup.
What are Dayton J22WB and J11W?
They solve different problems. Cure & Seal 25% J22WB is “a water based acrylic copolymer containing 25% solids” that cures, seals and dustproofs, drying to “a non-yellowing, durable, clear film” with a high gloss (Dayton Superior). Dayton calls it ideal indoors because it is low odor and nonflammable.
Clear Resin Cure J11W is “an all resin, dissipating water-based curing compound” for horizontal and vertical concrete. Its membrane “will begin to dissipate after exposure to sunlight, weathering and/or traffic” (Dayton Superior). For how that class works, see dissipating curing compound.
What do the Dayton data sheets say?
These are Dayton’s published numbers. “Not listed” means the sheet gives no figure.
| Item | Cure & Seal 25% J22WB | Clear Resin Cure J11W |
|---|---|---|
| Standard, type and class | ASTM C309 Type 1, Classes A and B; ASTM C1315 Type 1, Class A; AASHTO M 148 Type 1, Classes A and B | ASTM C309 Type 1, Classes A and B; AASHTO M 148 Type 1, Classes A and B |
| Base | Water-based acrylic copolymer | Water-based all resin, dissipating |
| Solids | 25% | Not listed |
| VOC | Less than 100 g/L | Less than 100 g/L |
| Application rate | 1st coat 200 to 400 ft²/gal (4.9 to 9.8 m²/L); optional 2nd coat 400 to 600 ft²/gal (9.8 to 14.8 m²/L) | 200 ft²/gal (4.9 m²/L) broom finish; 400 ft²/gal (9.8 m²/L) steel troweled |
| Dry time | 2 to 3 hours at 70°F (21°C) for recoat or light traffic; 12 hours for heavy traffic | About 2 hours at 70°F (21°C) |
| Dissipation | Does not dissipate; long lasting film | Begins to wear off within 30 to 60 days with traffic, sun and weather |
| Minimum temperature | 40°F (4°C); do not freeze | 40°F (4°C); do not freeze |
| Sizes | 5 gal pail, 55 gal drum | 5 gal pail, 55 gal drum, DOT drum and tote codes |
| Shelf life | 1 year unopened | 18 months unopened |
| Sheet date | 4/8/2025 | 12/2/2019 |
The J11W sheet also says it is “Tested and compliant per CDPH V1.2” and approved by “numerous state highway departments,” with separate product codes for TxDOT and Illinois DOT orders. Ask for the code your agency lists.
Where do J22WB and J11W fit, and where do they not?
Pick by what goes on the slab next. J22WB is the finish; J11W is a cure that gets out of the way.
| Job | J22WB | J11W |
|---|---|---|
| Interior slab left bare, wants dustproofing and gloss | Yes | No, the film wears off |
| Exterior flatwork in sun, nothing applied later | Yes; may show tire marks | Yes |
| Slab getting epoxy, urethane or polyester | Only after removal with Citrus Cleaner J48 or Green Bean Clean | Yes, after residue is removed |
| Slab getting paint, sealer or topping | No toppings over it | Yes, after residue is removed |
| Vertical walls and columns | Not addressed | Yes, two light coats, wet on wet |
| Joints before sealant | Do not spray into joints | Not addressed |
| Moisture-sensitive flooring | Check ACI 302.2R first | Check ACI 302.2R first |
Both sheets point to ACI 302.2R before moisture-sensitive flooring goes down. Neither product makes the flooring maker’s own approval unnecessary.
How do you apply J22WB and J11W?
Both go on once the free water is gone and the surface cannot be marred. Both sheets say do not delay and do not thin.
For J22WB:
- Agitate before each use. Do not use high speed mixing equipment.
- Use a low pressure sprayer, roller or brush, or Dayton’s Spray-Pro power sprayer.
- Apply uniformly without puddles at 200 to 400 ft²/gal for the first coat.
- Add the optional second coat at 400 to 600 ft²/gal for longer life and more gloss.
- Clean tools with water while wet.
For J11W:
- Stir before each day’s use. Do not use high speed mixing equipment.
- Spray if you can; Dayton calls spray the preferred method. A roller also works.
- Hold 200 ft²/gal on broom finish and 400 ft²/gal on tight troweled concrete.
- On walls, spray two light coats with a fine tip, the second while the first is wet.
- Clean tools with warm soapy water before it dries.
The J11W sheet warns that “Cool, damp conditions and/or over application may extend drying and dissipation time.” Do not lay it on heavy to be safe.
If you need to coat or floor over J22WB or J11W
Indoors, J11W will not clean itself. The sheet says that for “interior applications not exposed to weathering and sunlight the Citrus Cleaner J48 is to be used to remove the curing membrane.” Budget that step in the bid rather than waiting for it to wear off.
How much do J22WB and J11W cost?
On 2026-11-08, Certified MTP listed a 5 gal pail of J22WB at $267.02, a 5 gal pail of J11W at $88.08 and a 55 gal drum of J11W at $627.50. All three showed an estimated ship time of 2 to 3 weeks.
| Product and size | Price | Per gallon | Per ft² at 200 ft²/gal | Per ft² at 400 ft²/gal |
|---|---|---|---|---|
| J22WB, 5 gal | $267.02 | $53.40 | $0.27 | $0.13 |
| J11W, 5 gal | $88.08 | $17.62 | $0.09 | $0.04 |
| J11W, 55 gal | $627.50 | $11.41 | $0.06 | $0.03 |
J22WB costs about three times as much per gallon because it is a 25% solids sealer, not just a cure. The J11W pail page said it ships as hazardous material by heavy freight, not small parcel.
What are the alternatives to Dayton J22WB and J11W?
For a dissipating cure like J11W, W.R. Meadows 1100 and Euclid Kurez DR VOX fill the same slot. For a cure and seal like J22WB, compare solids and C1315 listing before price. The best curing compounds table lists standards, rates and sizes side by side.
Dayton J22WB vs Concrete Sealers USA TS202
| Spec | Dayton J22WB | TS202 |
|---|---|---|
| Standards | C309 Type 1, Class A and B; C1315 Type 1, Class A | C309 Type 1 and 1-D, Class A and B; C1315 Type 1 and 2, Class A |
| Base | Water-based acrylic copolymer | Water, pure acrylic |
| Solids | 25% | 25% |
| VOC | Less than 100 g/L | Under 100 g/L |
| Rate | 200 to 400 ft²/gal first coat | 250 to 350 ft²/gal as a cure and seal |
| Lowest temperature | 40°F (4°C) | 40°F (4°C) |
| Sizes | 5 gal, 55 gal | 1 gal, 5 gal, 55 gal |
Both columns are the makers’ published claims, not our tests.
Frequently asked questions
What is the difference between Dayton J22WB and J11W?
J22WB is a 25% solids acrylic cure and seal that leaves a lasting gloss film and meets ASTM C1315. J11W is an all resin dissipating cure that meets ASTM C309 and begins to wear off within 30 to 60 days in traffic, sun and weather.
Does Dayton J11W need to be removed before flooring or paint?
Yes, any residue. Dayton says that if the surface is to be painted, sealed, topped or otherwise treated, residual membrane should be removed. It names Citrus Cleaner J48 for full removal, especially indoors, on vertical work and where it went on heavy.
Can you put epoxy over Dayton Cure & Seal J22WB?
Not without removing it first. The data sheet says to remove J22WB with Citrus Cleaner J48 or Green Bean Clean before resinous coatings such as epoxy, polyester or urethane. It also says not to apply concrete or mortar toppings over the sealed surface.
What is the VOC of Dayton J22WB and J11W?
Both data sheets say less than 100 g/L. Dayton lists both as compliant with federal EPA, OTC, CARB, LADCO and SCAQMD rules for concrete curing compounds, and with Canadian rules.
How long does Dayton J11W keep in the pail?
Eighteen months unopened and properly stored, per the data sheet. J22WB is rated for 1 year. Do not let either freeze, and store drums on their side so water does not collect on the head.