Curing Compound for Homeowners: Driveways, Patios and Garage Floors

For a new driveway, patio or walk, most homeowners want a water-based acrylic cure and seal: it holds water in while the slab cures and leaves a light film that lasts. Spray two thin coats once the surface water sheen is gone. If the garage floor will get epoxy or tile, use a dissipating cure instead.

Guides in this section

What should I buy for my slab?

Start with what the slab is and what, if anything, goes on it later.

  • Plain broom-finish driveway, walk or patio: a water-based acrylic cure and seal, ideally with a C1315 Class A claim on the data sheet. Our driveway and stamped picks compare the options.
  • Stamped or colored concrete: a solvent acrylic with a wet look, where your state allows it, or a water-based one if you want a satin finish.
  • Garage or basement floor getting epoxy, tile or carpet: not a cure and seal. Use a dissipating cure, or plan to remove the film. Read curing compound and flooring first.
  • Not sure: the product chooser asks up to three questions and names a type.

How much do I need?

Home cure and seal data sheets list about 200 to 350 ft² per gallon for each coat. A 24 by 20 ft driveway (480 ft²) takes about 2 gallons a coat, so a 5 gal pail covers two coats with some to spare.

Put your own sizes into the coverage calculator. Heavier coats do not cure better; they peel and turn white.

When and how do I spray it?

  • Spray as soon as the water sheen is gone after the last finishing pass. See when to apply.
  • Check the weather: many labels want no rain for 24 hours and a minimum temperature of 40 to 50°F (4 to 10°C).
  • Use a garden-style pump sprayer with a fan tip and spray two thin coats at right angles. See choosing a sprayer and how to apply it.

Something went wrong. What now?

Where should I buy it?

Home centers stock gallon and 5 gal cure and seals such as Quikrete 8730 and Sakrete Cure 'n Seal. Concrete supply houses carry contractor brands, and some makers ship pails by normal package delivery. Compare them in Home Depot vs Lowe's vs a supply house and check prices in curing compound cost.