Affiliate Disclosure

Last updated

ConcreteCuringCompound may earn a commission when you buy through some links to retailers. The price you pay is the same either way.

Which links are affiliate links?

Only the "Check price" buttons on product pick cards. They go to Concrete Sealers USA, through the Awin affiliate network. Concrete Sealers USA sells its own house line (the TS and PS products), so those are the only products with a buy button. Every other link to a maker, retailer or data sheet is a plain link that pays us nothing.

How affiliate links are marked

  • A note under the page date on any guide that has a product pick card.
  • A line on each card saying we may earn a commission.
  • Affiliate links tagged so search engines treat them as paid (rel="sponsored").
  • The footer of every page links back here.

Why the brands we compare often have no buy button

W. R. Meadows, Euclid, Dayton Superior, Nox-Crete, Quikrete and Sakrete do not pay us. Their products stay in our comparisons and are often the right answer, especially for slabs that will get flooring, where a dissipating resin cure is usually the safer choice. A pick card only appears where a Concrete Sealers USA product genuinely fits the job on that page.

Commissions do not decide recommendations

Which product a guide points you to depends on the job: what goes on the slab next, where it is, and what the spec and local VOC rules allow. A product with no affiliate program can be, and often is, the recommendation. No manufacturer pays to be included or ranked. See our editorial policy and how we compare products.

Prices

Prices on this site are snapshots read from retailer pages on the stated date. Retailers change them often, so check the price at checkout.

Questions about this disclosure: contact@concretecuringcompound.com.