Curing Concrete: Time, Methods and Charts

Start curing within minutes of finishing and keep it going for at least 7 days, whether you use a compound, plastic sheeting or water. These guides cover how long curing takes and which method fits your job.

Guides in this section

Why curing matters

Concrete gains strength as cement reacts with water. If the surface dries out early, the top layer stays weak. That weak layer is where dusting, crazing and scaling start, and it is the part of the slab that takes all the wear. Curing keeps that water in place long enough for the surface to get as strong as the rest of the slab. See dusting, crazing and curling for what goes wrong when it is skipped.

Curing methods compared

Common ways to cure concrete
MethodHow it worksBest fitDownside
Curing compoundSprayed film holds water inLarge slabs, paving, hard-to-reach workFilm may need removal before flooring
Plastic sheetingSheet traps moisture on the surfaceSlabs that will get flooringCan blow off; can leave marks on colored work
Wet curingPonding, sprinklers or wet burlap keep the surface wetBest surface quality, no film leftLabor, water and constant checking
Curing blanketsHold moisture and heat inCold weatherCost and handling

The full comparison is in wet curing vs curing compound, plastic and blankets.

How long is long enough

A common minimum is 7 days of curing. Cold weather slows strength gain, so the same strength takes longer. In Canada, CSA A23.1 sets basic curing at 3 days at 50°F (10°C) or more, or until the concrete reaches 40% of specified strength. The curing time chart shows typical times for foot traffic, cars and full strength.