Concrete Curing Compound at Home Depot vs Lowe's vs a Supply House

Buy at Home Depot or Lowe's if you need a gallon or two of cure and seal for a bare driveway or walk. Go to a concrete supply house for dissipating cures, C1315 cure and seals, 5 gal pails and drums. Those listings loaded with prices on 2026-11-08; the big box pages did not.

Last reviewed 5 min read Has affiliate links (disclosure)

This page compares where you can buy curing compound, using only store pages that loaded on 2026-11-08. Every price shows the date and links to the listing. No affiliate links are on this page, and no store paid to be listed.

Where should you buy concrete curing compound?

Buy at a big box store when you need a gallon or two of cure and seal for a bare exterior slab. Buy at a concrete supply house when you need a dissipating cure for a slab getting flooring, a C1315 cure and seal, or 5 gal and larger sizes.

What you needBig box or hardware storeConcrete supply house
1 gal water-based cure and sealYes: Quikrete 8730 and Sakrete Cure ‘n SealSome carry Quikrete
Dissipating cure for a slab getting flooringNot found on a page that loadedYes: W.R. Meadows 1100, Euclid Kurez DR VOX, Dayton J11W
C1315 cure and sealNot found on a page that loadedYes: Dayton J22WB, Nox-Crete 1315 A
5 gal pailsNot confirmedYes, most listings
Data sheet on the listingVariesOften linked from the listing

If you are not sure which type you need, the curing compound chooser asks what goes on the slab next and points you to a type.

What do Home Depot and Lowe’s carry?

We could not see it directly. On 2026-11-08, Lowe’s product and category pages returned an access error, and Home Depot pages either returned an access error or did not resolve. We did not try to get around those blocks, so no Home Depot or Lowe’s prices appear on this page.

Search results point to Quikrete’s 1 gal cure and seal at both stores, Lowe’s item 5003785153. At Home Depot, search results also name Foundation Armor cure and seals in 1 gal and 5 gal and a DRYLOK curing membrane. None of those pages opened, so treat them as leads to check in the store app, not as confirmed stock.

What do hardware stores carry?

Hardware co-ops carry the same 1 gal products. At Alpers True Value, Quikrete’s 1 gal Acrylic Concrete Cure and Seal, model 873002, was $42.99, special order, price checked 2026-11-08.

The True Value site lists Sakrete 1 Gal. Concrete Cure ‘N Seal, model 65455000, but shows no price, only “In-store price may vary.” The best curing compounds comparison covers both products by data sheet.

What does a concrete supply house carry?

Commercial curing compounds by brand and standard, mostly in 5 gal pails, with the data sheet one click away. These are the listings that loaded with a price on 2026-11-08.

ProductTypeSizePrice, checked 2026-11-08
Dayton J11W Clear Resin CureWater-based, dissipating5 gal$88.08, Certified MTP
W.R. Meadows 1100 ClearDissipating5 gal$111.14, Outpost CS
Euclid Kurez DR VOXDissipating; C309 Types 1 and 1D, Class A and B5 gal$134.47, EMI Supply
ChemMasters Safe-Cure & Protect 309Water-based cure and seal; C309 Type 1, Class A and B5 gal$162.87, Kuhlman
Dayton Cure and Seal 1315 J22WBCure and seal, 25% solids5 gal$267.02, Certified MTP
Nox-Crete Cure & Seal 1315 A-350Solvent-based cure and seal1 gal / 5 gal$45.00 / $177.00, Vieira Concrete, page also said “Not Available For Sale”
Butterfield Clear Guard PRO 350Cure and seal, 350 g/L5 gal$402.19, Kuhlman
BonWay So-Cal Gloss Cure and SealCure and seal, under 100 g/L5 gal$105.00, Bon Tool

Types and standards are as each listing or its product name states them; where none is given, check the data sheet. The 1100 listing gives no type, but the W.R. Meadows 1100 data sheet says the membrane “will eventually dissipate from the surface.”

Toolbox Supply also carries the big box product: Quikrete 8730-02, 1 gal, $39.99, checked 2026-11-08.

Can you buy curing compound online?

Yes. Some makers sell direct, including Concrete Sealers USA, which lists its TS202 water-based cure and seal in 1 gal, 5 gal and 55 gal sizes. It was $169.95 for 5 gal on 2026-11-08.

How do the prices compare per gallon?

Plain dissipating cures from a supply house were the cheapest per gallon on 2026-11-08, and cure and seals cost more wherever you buy them. Dayton J11W at $88.08 for 5 gal works out to about $17.62 a gallon. The 1 gal Quikrete cure and seal was $39.99 to $42.99 at the stores that showed a price.

That is not a like-for-like comparison, because the products do different jobs and go down at different rates. The curing compound cost guide works out price per square foot by product.

Which store sells the right product for your slab?

The one that stocks the type your slab needs. For a bare driveway, walk or patio, a 1 gal water-based cure and seal from the big box or hardware store does the job. For an interior slab getting tile, wood, vinyl or epoxy, you need a dissipating cure, and every one we found was at a supply house.

Low-solvent products matter in some regions. If your air district caps VOC content, check the g/L on the listing or the label. Butterfield sells Clear Guard PRO 350 for regions that require 350 g/L, and ChemMasters lists Safe-Cure & Protect 309 at under 100 g/L.

How do you find curing compound near you?

Call a concrete or masonry supply house, or the ready-mix plant delivering your concrete, and ask for the product by name and type. Big box listings will not show you the dissipating or commercial products.

When you call, ask four things:

  1. Do you stock a dissipating curing compound, and which one?
  2. Is it in stock in 5 gal, or special order?
  3. Can you send me the data sheet?
  4. Does it meet C309, C1315, or both?

If the only thing on the shelf is cure and seal and the slab is getting flooring

Read curing compound and flooring before the pour. If the cure and seal is already down, the installer will want the product name off the label.

Frequently asked questions

Does Home Depot sell concrete curing compound?

Search results point to Home Depot listings for Quikrete Acrylic Concrete Cure and Seal and Foundation Armor cure and seals, but the pages blocked our fetch on 2026-11-08, so we could not confirm stock, sizes or prices. Check the app for your local store.

Does Lowe's carry curing compound?

Lowe's lists Quikrete's 1 gal cure and seal, item 5003785153, in search results. The Lowe's pages returned an access error on 2026-11-08, so price and stock are not shown here.

Where can I buy dissipating curing compound?

At a concrete or masonry supply house. On 2026-11-08, Outpost CS listed W.R. Meadows 1100 Clear, EMI Supply listed Euclid Kurez DR VOX, and Certified MTP listed Dayton J11W, all in 5 gal pails.

Is curing compound cheaper at a supply house?

Per gallon, often yes for plain curing compounds in 5 gal pails. Dayton J11W was $88.08 for 5 gal at Certified MTP on 2026-11-08, about $17.62 a gallon. Heavier cure and seals cost more anywhere.